RWE’s Aberthaw Power Station’s Weighbridge Replacements
Versatility and experience ensure effective weighbridge replacements
Weightron’s extensive expertise in weighbridge design and installation has been clearly demonstrated during the replacement of two aging weighbridges at RWE’s Aberthaw Power Station, west of Cardiff. The weighbridges play an important role at Aberthaw and over the past 12 months, Weightron have replaced both the incoming and outgoing weighbridges, each presenting different and specific challenges.